How do I schedule an Automation with the Lightwaverf Link Plus?

LightwaveRF Community: Welcome Forums Installation and Troubleshooting How do I schedule an Automation with the Lightwaverf Link Plus?

This topic contains 1 reply, has 2 voices, and was last updated by  h3mp 3 weeks, 2 days ago.

Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • #25566
     Jejoma says:

    Jejoma
    Participant

    I started out with a Lightwaverf Link system but have moved on to Link Plus.

    With the Link, one could set an event and then a timer to run it, which could be switched off but have the details still remembered. I.e. I could have a pre-planned holiday event that I would switch on with the same timer every time I went on holiday.

    Is this possible with the Link Plus? So far as I can work out once an Automation is created it runs. The only way to stop it is to delete it. This means that every time I go on holiday I have to build a new Automation.

    Am I correct or am I missing something?

    #25570
     h3mp says:

    h3mp
    Participant

    Yes you can pause automations.
    Once it is created, if you long-press the automation and scroll to the bottom of it there is a slider called “running” which can toggle it on/off

Viewing 2 posts - 1 through 2 (of 2 total)

You must be logged in to reply to this topic.